Site Preparation

How to prepare your site for Sir Walter lawn installation:


  1. It is very important to eradicate all vegetation on the site before installing your new turf. It is worth the 2 week wait to kill off all the previous lawns and weeds.
  2. Not sure if you need to add in extra soil? Please give me a call and we can discuss whether you need it or not.
  3. Install reticulation and garden beds
  4. If you have areas of brick paving: level the soil 30mm below the top of the paving to allow for the new turf.
  5. Once the soil is levelled – don’t forget to apply the lawn start fertiliser


Measure & Select


Instructions on how to measure your site before requesting a quote.



Read More

Site Preparation


How to prepare your site for Sir Walter Premium Buffalo Turf lawn installation.


Read More

Installation Tips


Some helpful tips on the important things to remember before installing your Sir Walter turf.


Read More